# Set up a manufacturing workspace on Finocket

> Bring in raw materials, finished products and opening stock, add your suppliers and job-work vendors, then build your first bill of materials and record a production run - in under 30 minutes.

Canonical page: https://finocket.com/help/onboarding-manufacturing
Last updated: 2026-09-25
Area: Use-case playbooks

A factory or workshop’s books start the same place any other business’s do (items, opening stock, suppliers), with one difference: some of what you make is itself the recipe for something else. This playbook gets your raw materials, finished products and suppliers into Finocket first, so your first bill of materials and production run have real numbers to work from.

1. Bring in what you already track

   If your raw-material and finished-goods stock already lives in Tally or BUSY, start an import under [Settings → Import & migrate](https://finocket.com/profile/import). Items, opening stock and your suppliers come across in one pass. Nothing on a spreadsheet? A blank [item template](https://finocket.com/help/items-catalog) is faster to fill in by hand than to type row by row on screen.
2. Set up raw materials and finished products as items

   Each raw material and each finished product needs its own [item](https://finocket.com/items), because a bill of materials can only name items that already exist. Turn on stock tracking for anything a production run should move; an item without it is simply ignored by a run later.
3. Count today's stock, raw material and finished goods alike

   Enter opening quantities for every item: what is on the shelf as raw material, and what finished stock you are already carrying as made goods. A production run only consumes and produces correctly once the starting numbers are real.
4. Put that stock in the godown where it actually sits

   Add your godowns (a store room, the shop floor, the office) and any bins inside them on [Inventory](https://finocket.com/inventory), and set a **Default godown** there. Then, on each new item, the opening stock goes into the godown you pick (and its bin, if it has one). Stock entered before you had godowns waits under **Stock not in any godown** on the same screen, where you can place it. Bins and put-away open with Inventory; you do not need Retail.
5. Add your suppliers, including anyone you send work out to

   Raw-material suppliers and any **job-work vendors** you hand material to for outside processing (plating, machining, finishing) both go under [Suppliers](https://finocket.com/suppliers), with the usual payable terms. Finocket does not yet have a dedicated job-work tracking screen for general manufacturing the way the jewellery vertical does for a karigar. See the note below for how to track it today.
6. Turn on Manufacturing and build your first bill of materials

   If Manufacturing is not already in your menu, switch it on under [Settings → Modules & features](https://finocket.com/profile/modules) (Inventory should already be on). On the [Manufacturing](https://finocket.com/manufacturing) screen, create a BoM for one finished product: pick the product, set how many units one run yields, and add each raw-material component with its quantity. The full walkthrough, including optional work centers, routing and work orders, is at [Manufacturing & bill of materials](https://finocket.com/help/manufacturing).
7. Record your first production run

   Pick the BoM, enter how many you made and the date, and save. Finocket consumes the components and adds the finished goods at their rolled-up cost. Both show in the item’s stock history, labelled Consumed and Manufactured.

> Sending material to a job-work vendor, today
>
> There is no dedicated "material out to job work, material back" screen for general manufacturing yet. Only the jewellery vertical’s karigar job orders work that way. Until then, two Finocket features cover it: raise a **delivery challan** (Invoices → New → Document type → Delivery Challan) to move the raw material out under the GST paper trail a challan is for (it does not create a sale), and record the **job-work vendor’s processing charge** as a supplier bill against them once the finished material comes back. Track what is currently out with a vendor the same way you would any other stock not on your own shelf, until it returns.

> Want to look around first?
>
> If your home screen offers **Try with sample manufacturing data**, it fills an empty workspace with an example factory: raw materials, two finished products with their bills of materials, purchases, production runs and two customer orders. Every example row is labelled \[SAMPLE\], and Profile → Account → Clear sample data removes them all. The button only appears on a workspace that has no records of its own yet.

> Tip
>
> New to Finocket? Bring your items and opening stock across first, then send one production run end to end before worrying about work centers or routing. See [Import your data](https://finocket.com/help/import-your-data) and [Inventory & stock](https://finocket.com/help/inventory-and-stock).

---
This is the Markdown copy of https://finocket.com/help/onboarding-manufacturing, published by Demystify Systems LLP. It is not a separate page: cite the canonical page.
