# Turn raw materials into finished stock, valued automatically

> Define a bill of materials per finished product, route it through named work centers, run it as a work order with step-by-step work-in-progress tracking, and record production runs that consume raw materials and add finished goods at a rolled-up cost with labour.

Canonical page: https://finocket.com/product/manufacturing-bom

## What it solves

If you make what you sell, the hard part is knowing what a finished unit actually costs and keeping raw-material and finished-goods stock in step. Finocket lets you define a bill of materials once, then record a production run: it draws down the components and adds the finished goods to stock automatically, at a rolled-up standard cost, so your make step keeps your inventory and its value honest.

## How it is different

Manufacturing rides on the same self-valuing stock ledger as everything else. A production run is a matched movement (components Consumed, finished goods Manufactured) you can see line by line, so the finished-goods value that lands on your balance sheet is derived from real component costs, not typed in by hand.

## What it does

### Bill of materials with rolled-up cost

Define a bill of materials for each finished product with a rolled-up standard cost, so you always know what a finished unit is built from and what it costs.

### Production runs that move stock

Record a production run and Finocket consumes the raw materials and adds the finished goods to stock automatically, with no manual stock adjustments on either side.

### Every movement visible

Each run shows as matched Manufactured / Consumed movements in the stock ledger, so the make step is fully auditable, not a black box.

### Work centers & routing

Route a bill of materials through named work centers with step-level consume and produce, and roll each step's labour (minutes × the centre's hourly rate) into the finished-goods value. Legacy BoMs with no routing run exactly as before.

### Work orders with a work-in-progress ledger

Run a routed bill of materials as a work order (draft, in progress, complete or cancel) and tick off each step as the floor finishes it. Every completed step accrues its material and labour into an append-only work-in-progress ledger, so an open order carries a real Work-in-Progress figure on your balance sheet and releases to exactly zero the moment you complete or cancel it.

### Work-centre capacity, honestly scoped

Give each work centre a minutes-per-day capacity and read the coming week's load per centre from your open work orders, with over-capacity days flagged and the earliest day that fits suggested. It's a planning aid, not a finite-capacity scheduler. Multi-level MRP netting (demand and on-hand stock in, net make-or-buy planned orders out) runs over the REST API and MCP rather than as an in-app planning screen; there is no master production schedule and no shop-floor terminal.

## Works with

- [Stock that values itself as you sell](https://finocket.com/product/inventory-stock): A production run consumes raw-material stock and adds finished goods to the same live ledger.
- [Real double-entry books your CA will accept](https://finocket.com/product/reports-and-books): Finished-goods value flows into Closing Stock on the balance sheet at rolled-up cost.
- [Confirm the order before you bill it](https://finocket.com/product/sales-purchase-orders): Purchase orders replenish the raw materials your production runs consume.

## Frequently asked questions

### How does a production run work?

Define a bill of materials for the finished product, then record a run. Finocket consumes the listed raw materials and adds the finished goods to stock automatically, each as a matched Manufactured / Consumed movement.

### How is the finished product costed?

From a rolled-up standard cost built off its bill of materials, so the finished-goods value on your balance sheet is derived from real component costs rather than typed in.

### Does it have work centers and routing?

Yes. Route a bill of materials through named work centers with step-level consume and produce, and each step's labour (minutes × its hourly rate) rolls into the finished-goods value. Legacy BoMs with no routing run exactly as before.

### Can I run work orders and see work-in-progress?

Yes. A routed bill of materials can run as a work order (draft, in progress, complete or cancel) and you tick off each step as it's finished. Each completed step accrues its material and labour into an append-only work-in-progress ledger, so an open order shows a real Work-in-Progress figure on your balance sheet and releases to exactly zero when the order completes or is cancelled. Completing the order records the production run and moves the stock.

### Is there capacity planning?

There's a planning aid, not a scheduler. Give each work centre a capacity in minutes per day and Finocket charts the coming week's load per centre from your open work orders, flags the days over capacity and suggests the earliest day a job would fit. Multi-level MRP netting is available too: post a demand list to the REST API or ask over MCP and you get net make-or-buy planned orders across the whole BoM tree. It has no in-app planning screen yet, and there is no master production schedule and no shop-floor terminal.

---
This is the Markdown copy of https://finocket.com/product/manufacturing-bom, published by Demystify Systems LLP. It is not a separate page: cite the canonical page.
