For manufacturers
From raw materials to finished stock
Define a bill of materials, run it as a work order, and Finocket draws down components and adds finished goods to stock — at cost — automatically.
No signup needed — explore with clearly-labelled sample data. Sign up any time to keep your work. Real payments and messages stay off until you do.
Bill of materials, rolled-up cost
Define a BoM per finished product with a rolled-up standard cost you can see and update.
Production runs move stock
Record a run and raw materials are consumed and finished goods added automatically — every movement visible as Manufactured / Consumed.
Work orders with a real WIP sub-ledger
Run a routed BoM as a work order, tick off each step as it's finished, and material and labour accrue into a work-in-progress sub-ledger in whole paise that reaches the balance sheet — then returns to exactly zero when the order completes or is cancelled. Entries are append-only: there is no rule that lets anyone edit or remove one. A retry after a dropped connection can't double-post, because uniqueness in the database is what stops it. A work order needs a routed BoM; an un-routed one still runs down the simpler one-shot production path.
Capacity you can see before you promise a date
Give a work centre its minutes per day and the capacity view shows where the load lands and which days are over. Be clear what it is: a scheduling heuristic against that per-day figure, not a finite-capacity scheduler and not a master production schedule — a work centre with no minutes set is left out of the overload maths rather than assumed infinite.
Orders, cost centres & COGS
Sales and purchase orders, per-line cost centres, and Closing Stock plus COGS folded into your final accounts.
Ready to ditch the spreadsheet?
Free for solo users. No credit card. Your books stay yours.
