The manual work this trade still runs on, what it costs, and what changes.

  1. Running bills are typed up in Excel from the site engineer's measurement sheets

    How it is done today
    Measurements are written in a register at site, copied into a spreadsheet, then retyped into Tally or a Word bill format
    Cost or risk
    Every bill is keyed two or three times; a wrong quantity or rate is found only when the client's engineer rejects the bill, delaying payment by a cycle
    With Finocket
    Raise the Running Account Bill once with L x B x H or area lines and a rate per unit, with the RA bill no., bill period and measurement-book ref. printed on it
  2. The client pays net of TDS and nobody can say which bill it belongs to

    How it is done today
    Bank credits are matched to bills by memory; TDS is chased in Form 26AS at year end
    Cost or risk
    Unclaimed TDS credit and bills that look unpaid when they are settled
    With Finocket
    Record each payment with the TDS the client withheld so the bill closes at gross and the TDS stays visible as a receivable
  3. TDS on sub-contractor payments is worked out by hand

    How it is done today
    The accountant deducts by rule of thumb, deposits late and prepares the quarterly return from a sheet
    Cost or risk
    Interest and late-filing fees, and disallowed expense if TDS was not deducted
    With Finocket
    Deduct TDS when you pay a sub-contractor, record the deposit and keep the return data ready
  4. Nobody knows whether a site made money until the job is over

    How it is done today
    Material, sub-contract and site expenses sit in one ledger; site profit is guessed from the bank balance
    Cost or risk
    Loss-making sites are found months late, after more money has gone in
    With Finocket
    Tag bills, purchases and expenses to a cost centre per site and read the site-wise P&L any day
  5. Material is bought on phone calls with no order or receipt on record

    How it is done today
    Supervisors call suppliers; delivery challans are collected in a bag and matched to supplier bills at month end
    Cost or risk
    Paying for material that never reached site, or paying twice
    With Finocket
    Raise a purchase order, record the goods receipt at site and match the supplier's bill against both
  6. Work order references go missing from bills

    How it is done today
    Site name and work order number are written in by hand or left off
    Cost or risk
    Clients send bills back for the reference, and payment waits
    With Finocket
    Site, work order number and date sit on every bill, and a location on every line
  7. Material leaves for site without the right e-way bill

    How it is done today
    The e-way bill is made on the portal separately, sometimes after the truck has left
    Cost or risk
    Vehicles stopped and penalties on the consignment
    With Finocket
    Generate the e-invoice and e-way bill from the same document that records the movement
  8. Year end means handing a box of bills to the CA

    How it is done today
    The CA rebuilds the books from bank statements, bills and spreadsheets
    Cost or risk
    High CA fees, late returns, and site-wise schedules that are never quite right
    With Finocket
    Invite the CA into the same books with reports, or export to Tally