Skip to main content

Challenges

The manual work this trade still runs on, what it costs, and what changes.

  1. Quoting a part without knowing what it really costs

    How it is done today
    The owner works out material and machine cost on a calculator or in an old Excel sheet whenever a buyer sends a drawing.
    Cost or risk
    Quotes are too low on complex parts and too high on simple ones, and nobody notices until the year-end books.
    With Finocket
    Build a bill of materials per part and read the rolled-up standard cost per piece before you quote.
  2. Machine time is never charged to the job

    How it is done today
    Hours on the lathe or VMC are noted on a register, if at all, and are not added to the job's cost.
    Cost or risk
    Machine-heavy jobs look profitable when they are not.
    With Finocket
    Name work centres with an hourly rate and route each part through them, so time per step lands on the job.
  3. Work in progress is a guess at month end

    How it is done today
    The supervisor counts half-finished parts on the floor and the accountant enters a round figure.
    Cost or risk
    Profit swings month to month for no real reason, and stock in the books does not match the shop.
    With Finocket
    Work orders carry a WIP ledger from start to close, which nets to zero when the order is closed into finished stock.
  4. Material sent to job workers on handwritten challans

    How it is done today
    Challans for plating, heat treatment or machining are written in a book; the return is matched by memory.
    Cost or risk
    Material with a job worker past the legal time limit can be treated as a supply, and nobody sees it coming.
    With Finocket
    Raise the delivery challan in Finocket with the job-work purpose, nature of work and original challan number on it. A custody register and the time-limit warning are not built yet.
  5. Dispatch details kept apart from the invoice

    How it is done today
    Vehicle number, transporter and e-way bill number are written on a separate slip or a WhatsApp message.
    Cost or risk
    A missing or wrong e-way bill can hold up a truck, and the CA cannot match dispatches to invoices.
    With Finocket
    Keep e-way bill number, vehicle and transporter on the invoice or challan itself.
  6. Stock spread across godowns that nobody can see at once

    How it is done today
    Each godown keeps its own register; the owner phones around to find a raw material.
    Cost or risk
    Duplicate purchases of material already lying in another godown, and stock-outs that stop a line.
    With Finocket
    Hold raw material and finished goods by godown, move stock between them, and give stores staff their own role.
  7. Outsourced job-work bills booked without TDS

    How it is done today
    Plating and heat-treatment bills are paid in full and TDS is remembered at the quarter end.
    Cost or risk
    Interest and disallowance when TDS is missed or late.
    With Finocket
    Record the job-worker bill as an expense against its challan reference and record TDS on it.
  8. The CA gets a bag of papers every month

    How it is done today
    Bills, challans and bank statements are photocopied or emailed to the CA, who re-enters them.
    Cost or risk
    GST returns are late or wrong, and the owner pays twice for the same data entry.
    With Finocket
    Invite the CA into the workspace to read the books and prepare GSTR-1 and GSTR-3B from the same entries.
Start freeSee pricing