Finocket for Automobile manufacturing & assembly
Built for automobile manufacturing & assembly
An assembly line where the BOM is the costing - chassis, motor, controller, battery pack, body - routed through welding, paint, assembly and end-of-line testing, and every vehicle leaving the plant carrying its own VIN from the work order to the dealer's invoice.
Chakra EV Motors - a demo automobile manufacturing & assembly workspace in Ludhiana, Punjab
A Ludhiana EV plant where every vehicle carries its VIN from the line
Before: Assembly cost estimated per model, VINs typed onto dealer invoices, and spares billed at a different rate from vehicles.
With Finocket: Each model's BOM is its cost; routing adds line labour; each vehicle produced gets its VIN and is sold against it; each line at the rate set on the item.
What automobile manufacturing & assembly businesses do in Finocket
The bill of materials is the costing
Open the E-Rickshaw Passenger (L3) BOM: raw materials and routing roll up into one cost per unit of e-rickshaws.
A work order from plan to finished stock
One draft, one in progress, one completed - start a draft and walk it through its routing steps.
Production consumes raw, yields finished
A completed run: raw material out, finished goods in at the rolled-up cost, labour from the work centres included.
Capacity by work centre
Which work centre is the bottleneck this week, from the open work orders' routing minutes.
Every vehicle has a VIN
Open the L3 model: VINs produced by each run, in stock at the yard or sold on a dealer invoice.
Vehicle and spare on one return
GSTR-1 carries vehicle and spare battery pack lines, each at the rate set on the item.
Powder coating is a step done outside
The L5 routing sends the welded frame to Focal Point Powder Coaters, set up as an outside work centre with its own rate and daily minutes.
Job-work bills as their own expense line
The powder coater's bills booked under Job Work - Powder Coating, the contractor payment TDS 194C applies to.
Every module this includes
Turn any module on or off. See the Suite plan, or every module and plan.
Ready to run your automobile manufacturing & assembly business on Finocket?
Free for solo users until 31 Dec 2026 — no partner code needed. ₹99/month after that. No credit card. Your books stay yours.